Page is the page number in the book, line is the number of lines from the top of the page, excluding tables, figures, headings etc. A negative line number is counted from the bottom of the page. Action is the correction to be made.
Page | Line | Action |
---|---|---|
xxv | 13 | Insert the sentence "Alisha Waller, Macalester University and Leon McGinnis, Georgia Tech provided helpful advice for several chapters." between "book." and "Peter Purdue" |
38 | 5 | Replace "lead time" by "lead times" |
97 | Prob | Replace "18" by "16" in time axis of figures (b), (c) and (d) of problem 4.8 |
98 | Prob | Replace "18" by "16" in the time axis of figure (e) of problem 4.8 |
129 | Tab | Replace "1.25" by "1.26" for Quarter 3 Average in Table 4-12 |
129 | -3 | Should be S13 = alpha(d13 /C9) + (1-alpha) (S12+B12) = 0.15(97/0.51) + 0.85(182.33) = 183.51 |
129 | -1 | Replace "178.83" by "183.51" and "5.15" by "5.6" |
130 | 3 | Replace "178.83" by "183.51" and "0.516" by "0.51" |
130 | 4 | Insert "do not" between "we" and "need" |
130 | 5 | Delete sentence "The new ... 0.37." |
130 | 7 | Replace "(1.78.83+5.15)1.86" by "(1.83.57+5.6)1.87" and "342.21" by "354" |
130 | 9 | Replace "(1.78.83+4x5.15)0.52" by "(1.83.57+4x5.6)0.51" by "105" |
152 | 2 | Replace "FT = 107" by "FT+1 = 107" and "dT = 97" by "dT+1 = 97" |
152 | 8 | Replace "smoothed estimate of forecast errors" by "sum of forecast errors" |
191 | 8+ | Replace "ri" by "pi" everywhere in the formula |
191 | 9 | Replace "ri is the production rate for" by "pi is the time (in periods) to make" |
193 | Prob | Replace "Goode Foods (Problem 5.19)" by "Consumer Electronics (Problem 5.18)" in problem 5.26 |
198 | Prob | Replace "Goode Foods (Problem 5.19)" by "Consumer Electronics (Problem 5.18)" in Problem 5.28 |
198 | Prob | Replace capacity columns of table in problem 5.29 with |
Month Machine Worker | ||
1 1350 19000 | ||
2 1270 19000 | ||
3 1350 19500 | ||
236 | 6 | Replace "+(sumici Qi" by "+ (lamda sumi ciQi" |
244 | Prob | Replace "EPQ case with backlog." by "EPQ case without backlog." in Problem 6.18. |
264 | -2 | Replace "-72/24D" by "-62/24D" |
280 | Tab | Replace "D" by D with an overbar in row 2 column 1 of Table 6-13 |
285 | 15 | Replace "(50+(40)(0.75))" by "(50+(4)(0.75))" |
295 | Prob | Insert "and the cost of the additive is $60 per pound." between "$170 per order." and "A fill rate" in Problem 6.92 |
295 | Prob | Add "Ordering cost is $400 per order." after "holding cost is 20 percent." in Problem 6.94 |
301 | Tab | Replace "244778" by "24478" in row 1, column 6 of Table 6-19 |
315 | Prob | Replace "500, 62, 750," by "500, 625, 750," in Problem 6.113 |
317 | 13 | Insert "policy" between "updated inventory" and "proposed by" |
327 | -8 | Replace "Dit" by "Dik " in equation (3) |
377 | 2 | Add "Assume each product requires the same capacity at each work center." after "MPS that is feasible." |
407 | Tab | Replace "2" by "1" in Row A column D and "3" by "2" in Row B column D of Table 8-14 |
418 | Prob | Insert "with 40 added to each due date," between "Problem 8.9" and "find the" in Problem 8.12 |
418 | Prob | Replace the pj data by |
j 1 2 3 4 5 6 7 8 9 10 | ||
pj 2 11 14 15 9 7 3 12 9 6 | ||
420 | 7 | Replace "65" by "60" |
420 | 13 | Replace "noon" by "7AM" |
450 | Box | Add "Credle, R., Finite Scheduling Helps Eaton Cut Line Setups and Increase Line Throughput, Case History: Scheduling, APICS -- The Performance Advantage , January, 30-32 (1993)." at the end of the text in Box 8-2 |
478 | 14 | Replace "L4 = min{L4, LS4-6} = min {12, 7} = 7" by "L4 = min{L4, LS4-6} = min {14, 7} = 7" |
478 | Tab | Replace "min {12, 7}" by "min {14, 7}" in row 6, last column of Table 9-5 |
483 | 10 | Replace "20" by "22" in Problem 9.17 |
484 | 7 | Replace "instead of three" by "instead of two" in part (g) of Problem 9.25 |
491 | -5 | Replace "3-4 and 5-9 can" by "3-4 and 5-6 can" |
517 | 7 | Bad spacing between problems 9.46 and 9.47 |
520 | 2 | Replace "$10,000" by "$5,000" |
581 | 17 | Replace "on realease time" by "on release time" |
571 | -2 | Replace "Demand is 500" by "Demand is 300" |
582 | -2 | Replace "An operation is processed" by "An operation processed" |
582 | -1 | Replace "1, determined" by "1 determined" |