|
Lecturer
Dates & Places
- Tuesday 14:00-16:00 HS 8
- Starting on 06.10.2009
- Dates: 6.10., 20.10., 27.10., 3.11., 10.11., 17.11., 12.1., 19.1.
Study Programs
- Mag.
internationale
Betriebswirtschaft (KFK Production Management, KFK Transportation
Logistics, KFK Supply Chain Management)
- Mag.
Betriebswirtschaft (KFK Production Management, KFK
Transportation Logistics, KFK Supply Chain Management)
Course Content
Aim of the course is to introduce students to scientific literature.
Students will learn how to search for literature about a specific
topic, how to classify research literature in the field of operations
management, how to write a scientific work, hot to summarize and give
presentations on scientific topics. This semester papers about
lot-sizing and scheduling will be discussed. Students have to
participate in class room discussions, they will have to write a
seminar work and give a presentation.
Grading:
- Discussions: 20 points
- Seminar work: 40 points
- Presentation: 40 points
- Grades:
- < 50 points - 5
- < 63 points - 4
- < 75 points - 3
- < 87 points - 2
- > 88 points - 1
Prerequisites
- Minimum
requirement for admission is one of the basic courses of the KFK
PM/SCM/TL (Production Analysis, Supply Chain Management, Transportation
Logistics)
Downloads
- Drexl, A., Kimms, A. (1997), Lot sizing and scheduling - Survey and extensions. European Journal of Operational Research 99, 221-235.
- Jans, R., Degraeve, Z. (2008), Modeling industrial lot sizing problems: a review. International Journal of Production Research, 46:6,1619-1643.
- Helber, S., Sahling, F. (2009), A fix-and-optimize approach for the multi-level capacitated lotsizing problem. International Journal of Production Economics, doi:10.1016/j.ijpe.2009.08.022.
Papers for seminar work:
- Akartunali, K. and Miller, A. (2009), A heuristic approach for big bucket multi-level production planning problems. European Journal of Operational Research, 193, 396-411.
- Ferreira, D.,
Morabito, R., Rangel, S. (2009), Relax and fix heuristic to solve
one-stage one-machine lot-scheduling models for small-scale soft drink
plants. Computers & Operations Research, doi: 10.1016/j.cor.2009.06.007.
- Homberger, J. (2009), Decentralized multi-level uncapacitated lot-sizing by automated negotiation. 4OR: A Quarterly Hournal of Operations Research, doi:10.1007/s10288-009-0104-1.
- Nascimento, M.,
Resende, M., Toledo, F. (2009), GRASP heuristic with path-relinking for
the multi-plan capaciatetd lot sizing problem. European Journal of Operational Research, doi: 10.1016/j.ejor.2009.01.047.
- Tempelmeier, H.
and Buschkühl, L. (2008), Dynamic multi-machine lotsizing and
sequencing with simultaneous scheduling of a common setup resource. International Journal of Production Economics, 113, 401-412.
Assignements
name |
paper |
date of presentation |
Gorenc, Ana |
Homberger (2009) |
Jan 12th, 2010 |
Mrda, Srdjan |
Nascimento et al. (2009) |
Jan 19th, 2010 |
Pisarew, Katharina |
Akartunali and Miller (2009) |
Jan 19th, 2010 |
Selmanovic, Enes |
Tempelmeier and Buschkühl (2008) |
Jan 19th, 2010 |
Turan, Belma |
Ferreira et al. (2009) |
Jan 12th, 2010 |
|
|